| Home | Search | Pollutants | About the Database |
| LDEQ Incident Number Incident Date |
Point Source(s) | Notes | Amount of Release |
| 81012 2005-08-04 | RCCU Flare (EPN #8-84), West Operations Ground Flare (WOGF- EPN 9-84) | Cause: maintenance was turning a blind when contents from the line started spraying; flaring occurred following the event Followup: Yes Notes: Under further investigation; no flare smoking occurred during this incident; remedial measures: vacuum trucks were deployed to try to capture the Oil in the RCCU drainage system, additional adjustments made to minimize the forward flow into the main fractionator column while isolations were made to the slurry system |
Connect With Us: